Race-1 Pro Series Race Prep: »
• Completion of Race-1 New Engine Checklist
• Handpicked Valve Springs Installed
• Springs Shimmed to Min. Installed Height (Rules Permitting)
• Distributor Advance Lockout Kit Installed (Rules Permitting)
• CII-257449 Plug Wire Set
• CII-NGK8 Ready To Run Spark Plugs
• Lift Plate
• Aluminum Exhaust Covers
• Oil Filter Adapter
• Oil Pressure Fitting and Cap
Dyno Evaluation and Engine Break-in: »
• 8 quarts Joe Gibbs Break-in Oil
• (2) Wix Oil Filters
• Water Temperature Fitting
• Break-in Fuel (10 to 15 Gallons)
• Complete Seating of Piston Rings
• Cam and Lifter Break-in
• Complete Dyno Evaluation of Engine's Power, Acceleration, Pressures and Temps
• Laboratory Oil Analysis After Break-In
Race-1 Secondary Engine Seal Process. New engine directly from our inventory. »
You must login to post a review.
Write the First Review!